Showing posts with label repairs. Show all posts
Showing posts with label repairs. Show all posts

Wednesday, 11 January 2012

Subway riders face 2nd night of 'fast track' repairs

See it on TV? Check here. NEW YORK (WABC) -- It is a subway maintenance blitz like we have not seen before. It goes far beyond cosmetic improvements.

Packing their tools and ready to work, 700 strong MTA workers began one of its most ambitious maintenance programs. Fast Track, they call it, focusing on 300 projects in a four night blitz -- 4-5 and 6 trains shut down for 7 hours.

"Certainly, it's going to impact customers and we understand that. But in the long run, we think it is better for them and better us that we get this work done. And our employees can work in a very safe environment," NYC Transit President Thomas Prendergast said.

Of the jobs completed the first night on their punch list: 320 third rail defects were corrected; they cleaned and scraped 5,000 feet of track, 34 of 63 signals were inspected; four switches were serviced; 15 stations were cleaned. Some power washed.

Many were painted like the 23 Street Station, where they added light fixtures and re-lamped.

No major complaints from riders so far. Iris Gonzalez responded on the Eyewitness News Facebook page: "I'm so glad I'm retired!!!" Awilda Fonseca says she had to change her way home, "but I took the E and managed to get home about the same time."

By five o'clock in the morning Tuesday, the trains were back in service.

The next Fast Track affects the 7th Avenue 1-2-3 lines February 13 thru 17.

Work on the 6th Avenue B-D-F occurs February 27 thru March 2nd.

The 8th Avenue A-C-E lines will be shut down March 12 thru 16.

For more information please visit: http://www.mta.info/nyct/service/fastrack.htm

---
Get Eyewitness News Delivered

Facebook | Twitter | Newsletters | Text Alerts

(Copyright ©2012 WABC-TV/DT. All Rights Reserved.)
Get more ABC7 Traffic Center »


mass transit, mta, subway work, abc7 traffic center, tim fleischer
// perform JavaScript after the document is scriptable.OTV.common.modules.promoCarousel.promoCarouselInit("/wabc/xml?id=5758260&ptnr=promoCarousel");


View the original article here

MTA plans overnight 'fasttrack' subway repairs

See it on TV? Check here. NEW YORK (WABC) -- The MTA is launching a bold subway repair plan. Instead of doing the work on the weekends, it is conducting repairs overnight. Major lines will be shut down, starting Monday night with the Lexington Avenue line.

The MTA is planning to knock out a lot of projects, from track maintenance to spot painting to power washing. They will also be repairing wall tiles, platforms and lighting. They are calling the series of repairs "Fasttrack," and they hope that straphangers will just grit their teeth and bear it.

Starting Monday, the 4, 5 and 6 lines will close from 10 p.m. until 5 a.m., and will do that every night through Friday.

The MTA says this will allow crews to safely and quickly handle more than 300 repair jobs along 27 miles of track. But it will add at least 20 minutes to the average ride.

The closures will stretch from Grand Central Terminal to Atlantic Avenue. The 1, 2 and 3 lines from 34th Street to Atlantic Avenue will be next up, closing overnights from February 13 to February 17. The Sixth Avenue line, parts of the B, D, F and M from 59th Street to 4th Street, will be under repair in late February.

And the A, C and E lines will have overnight work in mid-March from 59th Street to Jay Street.

There will be conductors and traffic checkers at subway stations Monday to answer commuters' questions.

---
Get Eyewitness News Delivered

Facebook | Twitter | Newsletters | Text Alerts

(Copyright ©2012 WABC-TV/DT. All Rights Reserved.)
Get more ABC7 Traffic Center »


mass transit, mta, subway work, abc7 traffic center, darla miles
// perform JavaScript after the document is scriptable.OTV.common.modules.promoCarousel.promoCarouselInit("/wabc/xml?id=5758260&ptnr=promoCarousel");


View the original article here